Look around first
What to notice
- Bronze figure of Joseph B. Strauss
- Rolled blueprints in the statue’s hand
- Inscription on the pedestal
- Blueprints and a test model of a tower
The story of the place
On the Golden Gate Bridge Plaza in front of the Golden Gate Bridge Welcome Center stands a bronze Joseph B. Strauss with rolled blueprints in his hand. The pedestal calls him “the man who built the bridge.” That inscription was no accident: for almost two decades, Strauss sought permits, money, and support for a crossing over the Golden Gate, and then directed its construction. But the bridge behind him was not designed by one person.
In nineteen twenty-one, Strauss hired Charles A. Ellis, an engineer and university instructor, who was to turn the idea into a structure capable of bearing its own weight, the wind, and vehicle traffic. Strauss’s original design was a heavy hybrid of cantilever and suspension bridges. After objections from consultants, Strauss agreed to a single suspension span—the silhouette that was built later.
Ellis directed thousands of stress and load calculations, drew up specifications, and prepared documents for contractors. Electronic computers did not yet exist: engineers used slide rules, pencils, and drafting boards. Those calculations determined whether it was possible to suspend a roadway more than a kilometer long between two towers without ending up with a beautiful structure that would collapse in its first serious test.
At the end of nineteen thirty-one, Strauss told Ellis to take a leave of absence. Shortly before it was due to end, another letter arrived: the leave was declared indefinite and unpaid, and all work was to be handed over to an assistant. The exact reason for his dismissal remains unknown. For Ellis, it meant losing his salary during the Great Depression, when even an experienced engineer found it difficult to secure a permanent position.
He continued checking the calculations at his own expense. For five months, Ellis worked about seventy hours a week and went through ten volumes of calculations again. After finding what he considered dangerous errors, he wrote to the project’s remaining engineers, but his warnings were rejected. In nineteen thirty-four, Ellis took a teaching position at Purdue University and returned to living on a professor’s salary.
On May twenty-eighth, nineteen thirty-seven, a ceremony opening the bridge to automobile traffic was held here, at the southern toll booths. Strauss handed the completed bridge to William P. Filmer, president of the Golden Gate Bridge, Highway and Transportation District. Ellis was not named publicly. His name was also absent from the plaque on the south tower that listed the project’s engineers and consultants.
Strauss died less than a year later. In nineteen forty-one, his widow Annette Strauss unveiled the bronze monument with that very inscription about the man who built the bridge. Ellis died in nineteen forty-nine; his first notable recognition came in an obituary. It is not even known whether he ever had the chance to walk across the structure for which he performed so many calculations.
The official correction came seventy years after the opening. In May two thousand seven, the leadership of the Golden Gate Bridge, Highway and Transportation District presented a new engineering report and acknowledged Ellis’s substantial share of the work on the suspension structure. The press conference was held on this same southeastern plaza, directly beneath the Strauss monument.
For the bridge’s seventy-fifth anniversary, the plaza was rebuilt, the Welcome Center opened nearby, and the statue was moved to its current location. Inside, blueprints, rivets, workers’ hard hats, and a test model of a tower are now displayed. Outside, Strauss still holds a rolled plan, and the pedestal still calls him “the man who built the bridge.” In the official account that visitors read nearby, the name Charles A. Ellis is now included.
Useful on site
Welcome Center daily 09:00-18:00; the eastern pedestrian sidewalk is usually 05:00-18:30 during PST season and 05:00-21:00 during PDT season; closures due to construction/events are possible.
Checked: June 26, 2026. Check the official source before visiting.Viewing the exhibits does not require going onto the bridge; before walking on the sidewalk, check current access and allow for strong winds.
